Threading the leader out the window allows the proposal to move forward and out of the building and into the site. I experimented with the leader passing through two windows of the studio. I used clear leader to project and did not apply anything to it. I allowed the building and the elements the leader was passing over create the film. Over a period of 5mins a new film was produced, with slight scratches being projected onto the wall. After 15mins a definite image had been produced. On larger scale over a longer period of time this could become an effective piece which will constantly change over time, from the first day of the installation to the last.

window leader from Theresa Williams on Vimeo.
No comments:
Post a Comment